Foreman’s Report 10-13-26
Work Completed
- Tomlinson rd has been all brushed back
- Finkle road brush cutting has continued
- Brush hog has moved to Potter rd kicking back brush
- Touch up grading all over town
- Leaf blowing ditches and culverts
Equipment & Administrative Notes
- Grader new tires are roughly 14,000
- Dump truck snow tires came in and we are swapping tires over to winter tires
- T2 has an electrical issue that DJ’s is repairing, believe it to be a short in the master shut off switch
- T1 side dump hydro lines replaced
Plan for the Next Two Weeks
- Continue brush cutting on Potter and Finkle
- Dig rocks out of Potter rd
- Blow leaves
- Grading and touch ups before winter
- Swap all truck tires
- Install plow frames