Foreman’s Report 10-14-25
Work completed in the last two weeks
- Highway work completed
- Newell hill roadside mulching is close to complete
- Fall touch up grading weather dependent
- Worked with GMP and MT3 resurfacing Terwilliger rd, buried lines are in and road is in good shape
- Gilfeather rd stumps are being ground down below road surface so the wing can clear the road fully
- Started to blow leaves off roadways, ditches and culverts
- Salt/Sand
- Still haven’t received salt pricing
- Sand is still being delivered
- Maintenance
- Swapped tires on all trucks to winter tires
- Put on plow frames all dump trucks
- Loader was serviced, direction lever was replaced
- Grader is scheduled for service, waiting to hear back from service tech at United Ag
- T4 serviced at DDS, oil and filters
Plan for the next two weeks
- Oil undercoat equipment
- Get plows pulled out, cleaned up and greased
- Put wings on and check hoses/fittings
- Leaf blowing roads
- Fall touch up grading and spreading material over thin spots