Foremans Report 10-27-26
Work completed
- Brush cutting is continuing on Potter road
- Road grading on South Wardsboro is close to wrapped up, few touchups needed on S. Wardsboro rd
- Cerpak spread on Potter rd over ledge and areas with thin gravel cover
- Leaf blowing roads/ditches and culverts has continued
- Parts room pulled apart and reorganized
Equipment & Administrative notes
- T4 tires swapped over
- T1 plow frame and wing installed
- T2 winter tires swapped
- Grader tires getting swapped on -10-27
- Southworth starting work soon at Town garage
- Plans for Sheldon hill #5 are incorrect, engineer was notified and we are waiting for response and corrections
- Scott Jensen and Meghan Brunk both shared corrections and details missing from RFP and engineers plans
- T3 went to DJs for repair
- Corroded main power wire running to the disconnect
Plans for the next two weeks
- Finish winter tire swaps on dump trucks
- Install plow frames and wings on t2 and t3, function check everything
- Continue potter road brush clearing
- Put mulching head back together
- Grade out pothole/blow leaves
- Finish top coating potter rd