Foreman’s Report 12-23-25
Work completed in the last two weeks
- Highway work completed
- Cleaned up trees and debris from wind storms
- Opened up culverts for rain storm
- Salt/Sand
- 2 loads of salt delivered
- Maintenance
- Replaced bed chain in T3
- Cleaned loader and lubricated throttle
- Pulled in excavator and fixing leaking fittings on ditching bucket
- Fixed drivers light bracket on T1
- Fixed T3 rear side dump pin
- Swapped wing cutting edge on T3
- Other
- Repaired salt shed, right hand side starting to bulge out
- Picked up parts from Viking, bed chains for t3 and t1
- Grader was delivered to United for service work
- T2 going to ATG 12/29 for mirror install
- Stacked fire wood @ town office
Plan for the next two weeks
- Clean out shop bays and organize parts room
- Replace bed chain and wear plates on T1