Foreman’s Report 2/10/26
Work completed in the last two weeks
- Highway work completed
- Grader push backs done
- Loader cleaned up intersections and guard rails
- Pushed back areas in town
- Plowing/sanding as needed
- Salt/Sand
- Sand still being delivered from the 500 yds ordered from Derrig
- Salt bin is full
- Maintenance
- Grader is back and running good, so far no diesel in oil
- Side dump portioning valve replaced on T3 due to corroded fitting
- T2 wing light replaced
- T1 front spring bolt replaced
- Grader front wing bolt broke/replaced same day
- Greased and checked fluids in the trucks
- Fixed T4 plow leak, flushed fluid
- Dump
- Other
- Reviewed new road standards
- Met with WRC at FD
- Cleaned out shop bays
- Installed wing on grader
- Permit for Bechtold
Plan for the next two weeks
- Check/grease trucks equipment
- Cleanup snow at the dump
- Push up sand as delivered
- Start on spring road maintenance list and road project list
- Winter rd maintenance