Foreman’s Report 3/25/2025
Work completed in the last two weeks
- Highway work completed
- Repaired scours from last weeks rain storm, most were smaller shoulder scours
- Placed stone in areas that were getting soft and smoothed them out with the grader
- Spot grading where needed
- Put up road signs for muddy roads
- Salt/sand as needed
- Maintenance
- Wing plows pulled off from trucks and grader
- Greased up all equipment and checked fluid levels
- Fixed T1 broken air can, adjusted brakes
- Swapped T1 tires as metal was showing from running chains
- Dump
- Nothing to report
Plan for the next two weeks
- Cut brush on Melis Rd, prepare for culverts this summer
- Mulching on Boardman loop to get some of the brush out of the roadway
- Monitor roads, spot grade as weather allows
- Paint wing plows and replace cutting edges for next year
- Paint grader wing
- Get truck bodies cleaned out and fix chain covers, oil after