Foreman’s Report 5-13-25
Work completed in the last two weeks
- Highway work completed
- Ditched Newell rd, will need to replace bottom culvert, full of sediment
- Continued mulching
- Cleaned out culvert inlets during rain
- Cut up downed trees on South Wardsboro road, bank keeps sliding in multiple areas
- Road grading finished up initial passes, touch ups and chloride as needed
- Salt/Sand
- Sand bids due next meeting
- Maintenance
- Trucks stripped, oil undercoated
- New teeth installed on mulching head
- Crack welded on ditching bucket
- Mower oil changed, cleaned deck and greased
- Loader batteries drained, pulled and charged/alternator tested good, will monitor for future issues
- Swapped tailgate valve in T2
- Other
- Mowing and trimming have started
- Review bids for paving
- Met with USDA about grant funding on 3 house sites in town
- Cleaned off lot in front of town garage
Plan for the next two weeks
- Cut brush and trees in areas were planning ditch and culvert work
- Touch up grading
- Change oil and filter in excavator
- Pick up grass seed and hay
- Get quote on a ram 5500 with regular dump body to replace t4
- Clean bridges with FD at training