Foreman’s Report 7/8/25
Work completed in the last two weeks
- Highway work completed
- Finished installing culverts on Bills rd
- Installed cross culvert on Blackpiece rd to help prevent erosion by the second house during heavy rain
- Touched up rough areas with grader
- Weedwack areas in town for preparation for the 4th of July
- Hay and seeded areas that were disturbed by ditch work
- Maintenance
- T3 brakes and rear axle seal worked on at ATG
- T1 brakes adjusted
- Excavator full service, all fluids checked good, recommended to swap hydro oil at next service interval
- Other
- Picked up donor truck at firehouse and put in metal dumpster
- Brought equipment back to shop for service work during week of the 4th
- Work on GMP ROW draft
- Roadside mowing starting in the next 2 weeks
Plan for the next two weeks
- Continue tree work on Gilfeather
- Map out areas for grants in aid work this year
- Start work on culvert inventory
- Continue draft for GMP work