Foreman’s Report 9/23/25
Work completed in the last two weeks
- Highway work completed
- Worked with Carr Tree doing traffic for the tree removals in town
- Top coated material on boardman loop to cover ledge
- Trucked cerpak to stockpile to prep for next rain day
- Road grading areas that are rough, raking and chloriding
- Prepped for road paving which is now completed
- Salt/Sand
- Salt prices will be $10+ higher per ton this year, waiting on call backs
- Sand is getting piled up
- Maintenance
- Loader PM, brakes and a few smaller items, needs a water pump which is ordered
- Trucks undercoated
- Dump
- Other
- EWP meeting with contractors
- Met with paving contractors
- Checked on GMP work on Terwilliger which is almost complete, road is in decent shape, ditches are cleaned out, culverts have been replaced and they will be topping the road with cerpak, we will work with them and chloride the road when they’re wrapping up
- Grader training with KP
Plan for the next two weeks
- Road grading rough areas and get chloride down to bind road together before winter
- Paint plow frames and put on trucks
- Mount leaf blower on loader for fall cleanup