GMP work on Podunk/Smead/Potter Roads & Newfane Road
Green Mountain Power has scheduled resiliency work on Upper and Lower Podunk Roads, Smead Road, and Potter Road for the weeks of June 15-19 and June 22-26. The work includes undergrounding lines (trenching) and replacing culverts/backfilling, as well as electrical work. Traffic control measures will be in place. Please use caution and be prepared for delays while traveling in the area.
Work will also occur on Newfane Road during June 22-26 which includes undergrounding lines (trenching), and electrical work.